Part II · Chapter 3 · Risk, without the score · lesson 10
The only expected-loss figure in this subject, and why it is here
15 min
Builds on Write down what your middle band actually means
Part II · Chapter 3 · Risk, without the score · lesson 10
15 min
Builds on Write down what your middle band actually means
This is the only expected-loss figure in the whole subject, and it is here to be taken apart rather than used.
Nine lessons of this track have refused to multiply two bands together. Now one model multiplies a frequency by a cost and produces a number in money, with units, that you could put in a slide. It belongs here for one reason: it is the respectable version of the arithmetic this track rejects, and because it is respectable, nobody checks it.
A frequency band and a cost per event. Band three means once a year. Call the event a quarter of a million. The answer is a quarter of a million a year, and it looks like a fact.
Before you touch anything: the frequency band is the softest input in the model. Nobody counted. It is a word somebody picked in a workshop. Move it one notch — the smallest move a five-point scale permits — and commit to what happens.
Predict
Loss expectancy
Hypothetical model, not a forecast
Multiplies a frequency band by a cost per event, and then reports what that product does when the frequency moves by one band — the smallest change the definitions allow. It answers how far the figure moves when its softest input moves a notch, and how that compares with the whole declared range on the cost. It does not answer what the loss will be, and nothing computed this way can: an average is the one summary of a tailed loss distribution guaranteed to be wrong.
It assumes
It ignores
Leave the money alone. Walk the frequency band from one to five and find the band where moving up one notch changes the answer least. There is a band that is not the top one.
1 once in a century, 2 once in ten years, 3 once a year, 4 once a month, 5 once a week.
The central estimate, which is the figure the expected annual loss is built from.
The cheapest the event could plausibly be. Clamped to the central estimate if it sits above it.
The dearest the event could plausibly be, excluding the tail nobody priced.
| Frequency band | If every event is cheap | At the central cost | If every event is dear |
|---|---|---|---|
| 1 | 1,000 | 2,500 | 10,000 |
| 2 | 10,000 | 25,000 | 100,000 |
| 3 | 100,000 | 250,000 | 1,000,000 |
| 4 | 1,200,000 | 3,000,000 | 12,000,000 |
| 5 | 5,200,000 | 13,000,000 | 52,000,000 |
Not there yet — keep moving the controls.
One notch beats the whole argument about the cost. At the opening values a single band is worth twelve times. The entire declared cost range — from the cheapest the event could plausibly be to the dearest — is worth ten. So the input nobody measured moves the answer further than the input the meeting was about, and it does it with the smallest move the scale allows. The two flags in the summary are there to say so out loud.
The band ladder is not evenly spaced either. Once a century to once a decade is ten. Decade to year is ten. Year to month is twelve. Month to week is a little over four. A notch is worth between four and twelve times depending on where you were standing, and the challenge above makes you find the cheap one.
Read that second point again with the first nine lessons in mind. This is the same complaint. Two ordinals multiplied give a number on a scale whose steps are uneven — and here the uneven steps have climbed inside a model that produces money, where the unevenness is invisible because the output has units on it.
That is why this lesson exists. The product of two bands is obviously made up; anybody can see there are no units. A figure in pounds is not obviously made up, and it is made up in exactly the same place.
Check
Everything above treats the cost of an event as a point with a range around it. Real losses are not shaped like that. There are a great many small ones and a rare enormous one, and the average of that distribution sits above almost every year you will actually have and below the one that ends the company.
Which means the average describes neither. It is the one summary of a tailed loss guaranteed to be wrong, and every figure this model reports is that average. That is the condition under which this entire lesson stops being useful, and it is the normal condition for the risks anybody worries about.
The honest use of the model is therefore narrow. It can tell you which of your inputs your answer is hostage to. It cannot tell you what you will lose, and no arithmetic of this family can, because the number that matters is the one in the tail and the tail is the part nobody priced.
The next thing anybody does with a figure like this is divide it by the price of a fix. Two hundred and fifty thousand of expected loss, forty thousand of control, and the ratio makes the decision look settled.
This model will not do that division, and the refusal is deliberate. The numerator moves by twelve when its softest input moves one notch, and the denominator is a quote from a vendor that is accurate to the pound. Dividing a number with an order of magnitude of slack by a number with none produces a quotient that reads as precise and inherits all of the slack.
In practice the quotient is almost never used to make a decision. It is used to justify one already taken, by whoever chose the band.