Part II · Chapter 4 · What a control is · lesson 4
The control that is there because a list said so
13 min
Part II · Chapter 4 · What a control is · lesson 4
13 min
A thirty-person company has two risks written down and four controls in place. Here they are, in full.
The risks, both written as sentences with a victim in them, which is the only form that is any use:
The controls, all four marked in place, all four with artefacts attached:
Nothing on that list is fake. Nothing was done lazily. The company could produce every artefact within the hour.
Predict
Two different gaps come out of comparing the two lists, and they have opposite remedies.
A risk with no control is the gap everybody expects. It is uncomfortable, visible once named, and the register is designed to surface it.
A control that no risk names is the gap nobody looks for, and it is the more informative of the two. It means work is being done, evidenced, reviewed and reported that no assessment ever asked for. Sometimes the right answer is that the risk was never written down. Sometimes it is that the control arrived from a list.
The second gap is where the hours are going. That is why it is worth finding first: it is the only place in this subject where the answer might be to do less.
Each of those controls has a plausible origin, and none of the origins is a risk assessment.
The awareness course came with the human resources platform. The storage encryption was a checkbox during setup and is genuinely worth having. The inventory exists because a questionnaire asked whether the company maintained one. The supplier file exists because somebody read a list of controls and started at the top.
That is the mechanism, and it is not negligence. A list is handed over, the list is worked through, and the working-through produces artefacts that look exactly like the artefacts a risk-driven programme produces. The difference is not visible in the folder. It is visible only in the lines, and the lines are the thing a list does not come with.
What would you do
You have the four controls above, the two risks above, and roughly twelve person-days of control effort available in the quarter. The finance lead has three hours a week of patience for process, total. One engineer can be asked to build something small.
A buyer's questionnaire arrives in six weeks and asks, among two hundred other things, whether you maintain an asset inventory and run annual awareness training. You do both.
For each control you have in place: which risk in your own register does this address? Not which risk it could be argued to help with. Which one, by number.
Where the answer takes more than a few seconds, you have found one. Where the answer is a risk you had to invent while answering, you have found one with a decision attached: either write the risk properly, or stop paying for the control, and both are legitimate.
The condition under which this whole exercise misleads you is a control named explicitly in a customer contract. Those do not need a risk in your register to justify them — the obligation is the justification — and a coverage check will flag them forever. The fix is a reason recorded against the control, not a risk reverse-engineered to cover it.