Part IV · Chapter 7 · The Audit · lesson 7
What being audited costs the people who are not running it
13 min
Builds on The bill is not the audit fee
Part IV · Chapter 7 · The Audit · lesson 7
13 min
Builds on The bill is not the audit fee
Everybody prices the fee. Somebody sends a quote, somebody else puts it in a spreadsheet, and the number goes into the business case as the cost of the exercise.
Nobody prices the other one: the hours the audit takes from the people who are not running it. The engineer pulled out of a release to explain the deployment pipeline. The office manager who has to find two onboarding records from eleven months ago. The head of support who sits in a ninety-minute walkthrough about a control she performs twice a year. None of them are on the project. All of them are on the critical path.
Predict
Two sources of effort, and only one of them grows with the company.
The scheduled part is the occasions. Walkthroughs, each sample round, the clarifications, the follow-up nobody put in a calendar. Each one costs some hours and interrupts some number of people. This part is almost completely independent of headcount: a walkthrough about change approval takes ninety minutes whether there are forty people or four hundred.
The churn part is the population that grows with you. Joiners and leavers produce the records that get sampled and chased, so a bigger organisation has more rows to go and find.
Price both, separately, and the shape of the answer is the lesson: at small and medium sizes this is mostly a fixed cost, which means being audited costs a sixty-person company nearly as much of its own time as it costs a four-hundred person one.
Control cost
Hypothetical model, not a forecast
The recurring effort one control consumes in a year, in person-days, and the headcount at which it outgrows a single owner.
It assumes
It ignores
Leave the occasions, the hours and the people where they are. Move only the last control: what is the smallest number of person-days a year one owner has to be able to give this before the scheduled occasions alone stop exceeding one person?
Scheduled operations of the control: 12 monthly, 4 quarterly, 52 weekly.
Hours one instance takes, per person involved.
People in the organisation, which is what the event rate is measured against.
Where one person's share of this control stops. 24 is a tenth of a working year; 240 is all of it.
| People in the organisation | Total person-days a year | From the scheduled occasions | From joiner and leaver records |
|---|---|---|---|
| 1 | 24.41 | 24.38 | 0.036 |
| 10 | 24.74 | 24.38 | 0.365 |
| 25 | 25.29 | 24.38 | 0.911 |
| 50 | 26.2 | 24.38 | 1.82 |
| 100 | 28.02 | 24.38 | 3.65 |
| 120 | 28.75 | 24.38 | 4.38 |
Not there yet — keep moving the controls.
Twenty-nine person-days a year, and twenty-four of them do not care how big you are. Only about a sixth of the total comes from the churn part at this headcount — the part everybody assumes is the whole story.
That flat line is the uncomfortable finding. A sixty-person company and a four-hundred-person company pay almost the same number of hours for the occasions, which means the smaller one pays far more of its total capacity. The work of being asked things does not scale down.
The challenge finds the other half. For the scheduled occasions alone to fit inside one person, that person has to be able to give this twenty-five person-days a year — five working weeks. Even then the total still needs a second owner, and the model puts the crossing at eighteen people. Nobody has five weeks, so in practice this does not have one owner; it has a dozen part-owners who each believe they are contributing an afternoon.
The follow-up is the part that is never in the quote. Whatever is agreed in the room becomes a change somebody implements, re-evidences, and explains again later. In this model it is hiding inside the occasion count, and in most organisations it is hiding nowhere, because the people doing it have gone back to their actual jobs and nobody is counting.
Check
Take the person-days figure and multiply it by what a day of the people involved actually costs you — engineers, managers, the person who holds the identity provider. Then put it next to the quote.
For most organisations in this size range the two numbers are at least the same order of magnitude, and the hours figure is frequently the larger one. It is also the one that never appears in the business case, never appears in the renewal conversation, and never gets compared between two firms offering different working methods.
This lesson deliberately stops short of doing that multiplication for you. A day rate is a fact about your organisation, not a fact about auditing, and a model that invented one would be putting a precise-looking total next to a number somebody made up.