Part IV · Chapter 8 · The Second Year · lesson 6
The second year costs less in fees and the same in hours
14 min
Builds on The bill is not the audit fee
Part IV · Chapter 8 · The Second Year · lesson 6
14 min
Builds on The bill is not the audit fee
The renewal quote arrives and it is well under half of last year's. Somebody forwards it with a one-line comment about economies of scale.
They are reading the only number anybody ever reads, and it is the smallest number in the exercise. The fee tracks the auditor's days. Your hours track your own control cadences, and nothing about a second year makes a quarterly control happen three times instead of four.
Predict
Two costs live inside every compliance programme and only one of them was ever quoted.
Build is everything you do once: deciding what applies, writing the policies, re-engineering the thing that could not be evidenced, choosing a tool, arguing about the boundary. It is large, visible, and it ends.
Run is what each control consumes every year for as long as you make the claim: instances times hours times the people in the room, plus the per-event work that scales with how many people join and leave.
Year one quotes build and run together as one project, so run is invisible inside it. Year two is run with the build removed, which is the first honest look anybody gets at the recurring number — and it is the number that should have been on the first page.
A composite sixty-person company, with the work sorted into what came back and what did not.
Did not come back. The readiness exercise against both frameworks. Writing and approving eleven policies. The engineering to make two controls produce an artefact at all. Selecting and configuring the evidence tool. The consultant's retainer. All of it real, all of it one-off, all of it the part that got discussed.
Came back. Operating eleven controls for a full window. Answering sample requests. The internal examination and the leadership review, which did not exist before certification and now happen every year. The quarterly instances, four times, for ever.
What follows prices one control out of the eleven: a quarterly review of who still has access to what, with the one-off work stripped out. Six hours an instance rather than the day and a half it took when the list was being built for the first time. Three people in the room, because the person who knows what a role grants is not the person who knows what the holder does.
Control cost
Hypothetical model, not a forecast
The recurring effort one control consumes in a year, in person-days, and the headcount at which it outgrows a single owner.
It assumes
It ignores
The owner of this control was given a day a month for it — twelve person-days a year — and at sixty people that is not enough. Hold everything else and find the smallest number of person-days a year one owner would have to be able to give this single control for it to stay one person's job.
Where one person's share of this control stops. 24 is a tenth of a working year; 240 is all of it.
| Headcount | What this one control costs a year | The scheduled part, which does not grow | The per-event part, which does |
|---|---|---|---|
| 1 | 9.07 | 9 | 0.075 |
| 10 | 9.75 | 9 | 0.75 |
| 25 | 10.88 | 9 | 1.88 |
| 50 | 12.75 | 9 | 3.75 |
| 60 | 13.5 | 9 | 4.5 |
Not there yet — keep moving the controls.
Thirteen and a half person-days a year, for one control, at sixty people. Nine of those come from the four scheduled reviews and four and a half come from joiners and leavers, and only the second half grows when the company does.
Two things fall out of that, and the second one is the finding.
One. A day a month is not enough. The owner needs fourteen person-days a year to hold this control alone, and the person who agreed to own it agreed to a day a month because that is what the invite looked like.
Two. The chart has a crossing on it. At a twelve-day budget this control outgrows a single owner at around forty people — which is a size most companies reading this have already passed, and passed without anybody re-reading the owner field.
Now the uncomfortable part, which this page will not do for you: run the same arithmetic for the other ten. Not all of them are this expensive and none of them is free, and the sum is the number that should have been on the first page of the first proposal. Nobody computed it in year one, because in year one there was a fee on the page and the fee looked like the price.
A build cost is paid out of a project budget, by a sponsor, once. Everybody in that conversation knows what they are agreeing to.
A run cost is paid out of individual weeks, by people who were not in the conversation, every year. It is never approved, because it never appears as a line item — it appears as three people being slightly less available than they used to be.
That is the mechanism by which an organisation acquires a programme it cannot sustain while every individual decision looked affordable. The protection is unglamorous: price run separately, name the owners, and tell each of them the number of days rather than the name of the control.
It also changes which controls you choose. Of two designs that address the same risk, the one with fewer instances and fewer people per instance is cheaper in a way that compounds annually, and that comparison is invisible if the only figure anybody holds is the build cost.
Check