Part III · Chapter 6 · The Window · lesson 9
The control that ran twice in a period that wanted four
13 min
Builds on How many of these should exist by now?
Part III · Chapter 6 · The Window · lesson 9
13 min
Builds on How many of these should exist by now?
The control is a quarterly re-approval of who can reach production. The period is twelve months. Four instances were due.
Two happened. One in April, one in November. Both are immaculate: the right person reviewed them, the list is attached, three accounts were removed and the removals are dated. Nobody falsified anything and nobody was careless with the two that ran.
Two quarters have nothing in them at all.
Two clean instances out of four due is not a sample.
A sample is a selection from a population, drawn so that what it shows can be extended to what was not looked at. Here the population is four and all four are known: two ran and two did not. There is nothing to extend and nothing to bound — the arithmetic from earlier in this track has no work to do, because nothing is unexamined.
What exists is a control that operated twice in a period during which it was described as operating four times. That is a fact about operation, and the only open question is how it gets written down.
Three sentences are available. One of them describes what happened.
What would you do
You are writing the description of this control for a period report, and you are the one who noticed the two empty quarters. The reviewer has not asked about them yet; the sample request lands next week and will name specific quarters.
The control owner moved teams in June. Nobody reassigned it, and nobody has done it since November, when a different person picked it up for reasons unrelated to the schedule. The policy on file says quarterly. Your largest customer contract does not mention a cadence; it mentions periodic review.
Everything above assumes quarterly meant something. Ask where the number came from.
If a customer contract or a regulator specifies the frequency, missing it is a breach of an external commitment and the description is the smaller of your problems. That is a conversation with a counterparty, and the report is just where they find out.
If the quarterly cadence was your own choice — somebody wrote a number in a policy three years ago and nobody has revisited it — then missing it is breaking a promise you made to yourself. That is still a real exception, because the description of the system said quarterly and the period is judged against the description. But the remedy is different and better: you can decide, now, with a dated decision and a reason, that this control runs semi-annually from here on, and then meet that.
The difference between that and option B is six words long and it is the whole thing: from here on, rather than all along. A cadence changed prospectively with a reason is a design decision. The same change applied backwards is a description that disagrees with your own files.
Check